
| Parameter | RIOLATEX RSC-AU Series | Localized Adaptation |
| Type | Cross-tensioned rubber screen cloth | Matches Australian mining standard tensioning systems (Eurotech/Reglin pattern) |
| Module Size | 305×610 mm (12"×24") | Compatible with all Australian OEM screen decks (Metso, Schenck, Ludowici) |
| Aperture Range | 2mm – 80mm square / slotted | Covers scalping through fine screening across iron ore flowsheets |
| Shore Hardness | 40A / 50A / 60A (selectable) | 60A for primary scalping, 40A for high-moisture fine screening |
| Thickness | 30mm / 40mm / 50mm | 40mm recommended for SAG mill discharge; 30mm for tertiary screens |
| Open Area | 32%–52% (aperture-dependent) | Customizable — we adjust open area to match your tonnage target |
| Steel Reinforcement | 304 stainless steel frame + wire mesh layer | Austenitic SS for Pilbara humidity — zero corrosion after 2-year field test |
| Rubber Compound | RIOLATEX LPR-95 (95% rubber content) | 2.3× elasticity vs standard PU; field-validated at FMG and Roy Hill sites |
| Installation | Cross-tensioned (4-bolt corner system) | Direct bolt-on — no deck modification, 2-man crew, 45-min per panel |
| Certifications | ISO 9001:2015, AS 2758 compliant, NATA-equivalent abrasion test | Australian standards alignment verified by third-party lab |
| MOQ | 10 panels per aperture/size | No minimum for trial orders — we ship sample sets to Perth within 10 days |
| Bulk Pricing Tier | MOQ 50+ / 200+ / 500+ panels | Volume discounts up to 22% for annual contract customers |
| Metric | Before (OEM PU Panels) |
| Panel replacement cycle | Every 47 days (average) |
| Unplanned screen downtime | 14.2 hours/month |
| Effective open area after 8 hours | 18.7% (nominal 38%) |
| Annual panel procurement cost | AUD 1,840,000 |
| Production loss from pegging downtime | ~92,000 tonnes/year |

| Metric | After (RIOLATEX) | Improvement |
| Panel replacement cycle | 134 days (average) | 1.85 |
| Unplanned screen downtime | 4.7 hours/month | -0.67 |
| Effective open area after 8 hours | 31.4% (nominal 33%) | 0.68 |
| Annual panel procurement cost | AUD 1,215,000 | -0.34 |
| Production loss from pegging downtime | ~18,000 tonnes/year | -0.8 |


If you are interested in the product, contact 2bvideo.com for more information for more information
The information of 2bvideo.com limited shown above is provided by the user or collected on the network. Video 2B does not guarantee the authenticity,accuracy and legitimacy of 2bvideo.com limited information. Video 2B does not involve legal relationships and disputes between users arising from transactions other than secured transactions on this website. Disputes shall be settled by you through negotiation. If you are the person in charge or relevant employee of this enterprise, if you find that the enterprise information is incorrect or want to manage thiscompany, please contact us jacklee1558@gmail.com, after you claim the enterprise, you can obtain management permission, publish supplyand demand information, bring consulting orders, and remove page advertisements.
Main Product:
Mining Hose,
Slurry Hose,
Mining Spool ,
rubber screen panel,
rubber liner,
rubber sheet