Get Quote
730 people are quoting
X

PC60-7 LS valve

2 month ago
3 0
Product details
Komatsu PC56 Excavator Main Relief Valve Specification
 
Basic Information
 
Applicable Model: Komatsu PC56-7
Other Names: Main Safety Valve, Two-stage System Relief Valve
Mounting Position: Installed on both ends of main control valve, one piece for front pump and one for rear pump separately.
 
Core Functions
 
1. Limit maximum system pressure to protect main hydraulic pump, cylinders and high-pressure hoses from overpressure damage.
Factory standard setting: Primary pressure 32.5 MPa, boost secondary pressure 35.5 MPa.
2. Two-stage pressure shift with power boost function:
Light-load condition (pilot off): 32.5 MPa for energy saving;
Heavy-load digging (pilot on): 35.5 MPa to boost digging force by around 10%.
3. Stabilize system pressure and prevent engine lugging and hose burst under overload.
 
Structure & Operating Principle
 
- Construction: Direct-acting poppet type, composed of poppet, compression spring, adjusting screw, O-ring and fixed orifice.
- Normal status: Pressure below set value, poppet kept closed by spring force, full hydraulic oil flows to actuators.
- Overpressure status: Hydraulic force lifts poppet, surplus oil drains back to tank to cap system pressure.
- Two-stage logic: Pilot oil feeds into spring chamber to compress spring and raise relief setting for high-power digging.
 
Key Technical Data
 
- Primary set pressure: 32.5 MPa
- Boost secondary set pressure: 35.5 MPa
- Cracking pressure: approx. 31.5 MPa
- Mount thread: M14×1.5
- Material: Hardened steel poppet, carbon steel valve body, alloy steel spring
 
Common Defects & Performance Issues
 
1. Low pressure below 30 MPa: Weak overall power, slow working speed, poor compound movement performance.
2. Overpressure over 37 MPa: Engine lugging, pipeline vibration, abnormal noise and hose burst risk.
3. Stuck poppet or clogged orifice: Unstable pressure, excessive oil temperature, irregular operation speed.
4. Internal leakage or worn seals: Fast idle pressure drop and cylinder drifting.
5. Failed boost function: Insufficient digging power under heavy load.
 
Pressure Adjustment
 
- Clockwise rotation = increase pressure; Counter-clockwise rotation = decrease pressure.
- Standard setting: Primary 32.5 MPa, secondary boost 35.5 MPa.
- Recommended lock nut torque: 20~25 N·m.
 
Glossary
 
Main Relief Valve
Main Safety Valve
Two-stage Relief Valve
 
default name
Contact Now

If you are interested in the product, contact 2bvideo.com for more information for more information

To:
Ningbo Hengnuo Hydraulic Drive Co.,Ltd
Message:
Submit
Disclaimer:

The information of 2bvideo.com limited shown above is provided by the user or collected on the network. Video 2B does not guarantee the authenticity,accuracy and legitimacy of 2bvideo.com limited information. Video 2B does not involve legal relationships and disputes between users arising from transactions other than secured transactions on this website. Disputes shall be settled by you through negotiation. If you are the person in charge or relevant employee of this enterprise, if you find that the enterprise information is incorrect or want to manage thiscompany, please contact us jacklee1558@gmail.com, after you claim the enterprise, you can obtain management permission, publish supplyand demand information, bring consulting orders, and remove page advertisements.

Audited supplier
4 year
Address: Ningbo, China


Main Product: hydraulic motor , gear box, hydraulic pump, hydraulic valve , hydraulic winch, hydraulic system

Disclaimer:
The information of 2bvideo.com limited shown above is provided by the user or collected on the network. Video 2B does not guarantee the authenticity,accuracy and legitimacy of 2bvideo.com limited information. Video 2B does not involve legal relationships and disputes between users arising from transactions other than secured transactions on this website. Disputes shall be settled by you through negotiation. If you are the person in charge or relevant employee of this enterprise, if you find that the enterprise information is incorrect or want to manage thiscompany, please contact us jacklee1558@gmail.com, after you claim the enterprise, you can obtain management permission, publish supplyand demand information, bring consulting orders, and remove page advertisements.
Content Us